|
Basis of the plan |
 |
A space large enough for the stream was secured not to cause flood relying on the data collected in the past 200 years about local torrential rain. |
 |
Considering the Cheonggyecheon as being a stream in a city, the height of overhead clearance has been applied relying on the rate of 1950~1980.
|
 |
Design criteria - Starting point ~ Point of joining the Seongbukcheon(Stream): Local stream Grade-II (Design made relying on the data collected in the past 50 years) - Point of joining with the Seongbukcheon ~ Point of joining with the Jungnangcheon (Stream): Local stream Grade-I (Design made based on the data collected in the past 80 years)
|
|
|
|
Flood water level |
|
|
Major measurements of the stream |
 |
Width: 19~13m |
 |
Low water channel width: 6~72m |
 |
Width of terrace spaces on both sides of the stream: 2~27m |
 |
Height of terrace spaces on both sides of the stream: 3~7m |
 |
Height of low-water terrace spaces: 1~3.7m |
|
|
Frequency of inundation |
 |
In the case of terrace spaces on both sides of the stream: 3 times in a year |
 |
In the case of low-water terrace spaces: 10 times in a year |
|
|